pipe removalA few months ago we were able to negotiate an easement for an underground pipeline to replace the very old above ground one that traversed the east side of the property.  We had to wait for the gas company to disconnect the old line in order to remove it. They cut it loose a week ago and we have all of the main line out now (about 4000 feet). There were two sections of it that were underground. One was the ball field on the south end and the other was about 800 feet of poly that was added later on the north end of the line. We are still removing abandoned lines that crossed/connected to the main line in that northern section. The rest of it we drug out in large sections to the field by the cafeteria.